November 2, 2011

An investigation into a gantry crane collapse

Critical mistakes were made during the disassembly that severely overloaded the hinges. The mistakes included jacking the towers to reduce
Read More

Wind turbine erected at 2,465 metres

Welti-Furrer Pneukran & Spezialtransporte has erected a 2.3 megawatt Enercon E-70 wind turbine at an altitude of 2,465 metres, near
Read More