CATEGORIES

Crane snags overhead lines

WRITTEN BY

Share :

The slings of a tower crane working alongside an electrified rail line in Cologne (Köln), Germany got caught up in the overhead power lines on Saturday, causing some power outages and disruption to the trains.

Overhead lines A
The crane was working on a construction site alongside the tracks

Fortunately no one was hurt in the incident, the operator was using the crane’s remote controls at the time. He appears to have slewed over the tracks with a set of slings dangling below the hook which caught firmly in the lines that feed the trains.

Overhead lines B
The slings become firmly tangled in the wires

Author; Unknown

Source:

http://www.vertikal.net/en/ne/ws/story/19777

RELATED blogs

Safe Work Practices and SWP checklists (tower/self-erecting cranes)

Sa­fe Wo­rk Pr­ac­ti­ce­s, or SW­Ps, de­sc­ri­be th­e ag­ree­d up­on st­ep­s cr­ew­s fo­ll­ow wh­en th­ey op­er­at­e, in­sp­ec­t, or ma­in­ta­in a to­we­r

Tower Crane Binder Expectations and Site Binder Templates

A ­cr­an­e ­bi­nd­er­ i­s ­a ­st­ru­ct­ur­ed­ c­ol­le­ct­io­n ­of­ a­ll­ s­af­et­y,­ o­pe­ra­ti­on­al­, ­an­d ­co­mp­li­an­ce­ d­oc­um­en­ts­ r­el­at­ed­ t­o ­a ­sp­ec­if­ic­ t­ow­er­ c­ra­ne­

Crane Attachments: A Guide to Improving Lift Material Handling

Cr­an­e a­tt­ac­hm­en­ts p­la­y a­ k­ey r­ol­e i­n i­mp­ro­vi­ng h­ow m­at­er­ia­ls a­re h­an­dle­d o­n c­on­st­ru­ct­io­n s­it­es a­nd i­nd­us­tr­ia­l p­ro­je­ct­s. T­he r­ig­ht