CATEGORIES

Share on:

Radio remote saves operator

WRITTEN BY

Power to the small town of Pfalzdorf, Germany was cut when a loader crane struck an overhead power line.

The crane had finished unloading when its boom inadvertently came into contract with the 10kW power line. Fortunately, the operator was unharmed in the incident as he was operating the crane with a radio remote controller. The current did flow through the vehicle, melting the asphalt under the outriggers.

Firefighters secured the scene while the power was disconnected and the crane removed.

Radio Remote saves operator
The tip of the loader crane boom touched a power line in Pfalzdorf

Author; Unknown

Source:

http://www.vertikal.net/en/news/story/21269/

RELATED blogs

Tower Crane Binder Expectations and Site Binder Templates

  A ­cr­an­e ­bi­nd­er­ i­s ­a ­st­ru­ct­ur­ed­ c­ol­le­ct­io­n ­of­ a­ll­ s­af­et­y,­ o­pe­ra­ti­on­al­, ­an­d ­co­mp­li­an­ce­ d­oc­um­en­ts­ r­el­at­ed­ t­o ­a ­sp­ec­if­ic­ t­ow­er­

Safe Work Practices and SWP checklists (tower/self-erecting cranes)

Sa­fe Wo­rk Pr­ac­ti­ce­s, or SW­Ps, de­sc­ri­be th­e ag­ree­d up­on st­ep­s cr­ew­s fo­ll­ow wh­en th­ey op­er­at­e, in­sp­ec­t, or ma­in­ta­in a to­we­r

Crane Attachments: A Guide to Improving Lift Material Handling

Cr­an­e a­tt­ac­hm­en­ts p­la­y a­ k­ey r­ol­e i­n i­mp­ro­vi­ng h­ow m­at­er­ia­ls a­re h­an­dle­d o­n c­on­st­ru­ct­io­n s­it­es a­nd i­nd­us­tr­ia­l p­ro­je­ct­s. T­he r­ig­ht